Project Details
Trackwork System
There are two types of rail: standard rail and head harden rail. This project uses 7,978 tons of rails.
1) Metro rail
There are two types of rail: standard rail and head harden rail. This project uses 7,978 tons of rails.

standard rail and head harden rail

2) concrete pillow
This project uses approximately 63,000 concrete sleeper.

Concrete sleeper

3) Binding machines, rail
This material used to fasten a rail to a concrete sleeper. This project uses approximately 63,000 sets of rail fasten.

rail fastening

4) wrench
The equipment is installed at the rails used to turn the cars out of the way as needed. There are about 65 sets of turnout in the project.

turnout

turnout

5) the third rails
The equipment is used to collect and transfer the 750 Volt electricity to electric train. There are about 61,500 meters of third rail in the project.